When spin welding there is a fixtured part and a driven part. The base part needs to be supported and aligned during the spin welding process. While the driven part can be loaded into the upper drive head or loaded on top of the fixtured part. Fixtured parts do not require any key features for the spin welding process.
19 Sargent Drive
Bethany, CT 06524 USA
Telephone: 203-393-0639
Toll Free: 866-882-1701
Fax: 203-393-0395
Email: [email protected]
The team at PAS would like to thank you for your interest in our company!